Installation - Prince Castle IRT-SB-NA-1PS Operation Manual

Horizontal infrared toaster
Hide thumbs Also See for IRT-SB-NA-1PS:
Table of Contents

Advertisement

Horizontal Infrared Toaster
IRT-SB-NA-1PS
IRT-SB-NA-3PS
Unpack and Inspect. Remove the unit from the car-
1
ton and inspect for signs of damage. If there is damage
to the unit:
Notify the carrier within 24 hours of delivery
Save carton and packaging materials for inspection
purposes.
Contact your local dealer.
Verify parts. Verify that all parts have been received.
2
When replacing parts use Prince Castle parts only.
Horizontal Infrared Toaster
Out-Feed Tray
In Feed Rack
Crumb Tray (Already installed)
Place toaster on a sturdy surface. Remove blue and/
3
or white protective covering prior to powering on.
Two man lift, unit weight is more than 50 lbs.
Follow daily PM procedures.
4
IRT-SB-NA-1PS
IRT-SB-NA-3PS
CAUTION

Installation

Install In-Feed Rack . Slide the in-feed rack onto 1
5
hook on each side. Ensure the rack is secure before
operating the unit.
Install Out-Feed Tray. Insert the Out-Feed Tray onto
one hook on each side. Ensure the rack is secure before
operating the unit.
Plug unit in. Plug unit into a grounded receptacle
6
with a matching plug configuration.
All electrical connections must be in accordance with local electri-
cal codes and any other applicable codes.
If the supply cord is damaged, it must be replaced by the manufac-
turer, its service agent, or similarly qualified persons in order to
avoid hazards.
To prevent an electric shock hazard, this device must
be bonded to equipment in close proximity with an
equipotential bonding conductor. This device is
equipped with grounding lug for this purpose and is
marked with the following symbol.
3
WARNING
Printed in USA 9/15
353-566

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irt-sb-na-3ps

Table of Contents