Inspection - Weir SPM Flow Line Installation Manual

Safety restraint system (fsr)
Table of Contents

Advertisement

THIRD
Install the SPM
be threaded through the Ribs already installed on the flow line.
See pages 23-25 of this guide for reference.
TIP - It is recommended to start at one end and work
toward the other end.
TIP - Installers should remember to twist SPM
prior to installing the SPM
This helps ensure a tight installation
FOURTH
Install the SPM
guide for reference.

INSPECTION

In order to ensure the continued safe operation of the SPM
Line Safety Restraint System, Weir Oil & Gas requires annual
SPM
FSR inspection. Inspection of SPM
®
must be performed by a Weir Oil & Gas technicians. Contact
your Weir Oil & Gas sales representative at 1-800-342-7458 to
schedule the annual inspection.
The primary mode of inspection is a visual inspection according
to SPM
Flow Line Safety Restraint Annual Inspection Procedure.
®
Proof Load Testing is also offered by Weir Oil & Gas. This testing
requires multiple samples to be destroyed by pull-test. Though not
mandatory, this testing offers an additional level of reassurance.
*Identification tags must be punched or marked with the date the
inspection was performed.
Reference Documents for Annual SPM
Weir Oil & Gas Engineering Bulletin 1024
This bulletin briefly explains the annual SPM
details which documentation is required.
FSR main line Spines next. These Spines should
®
FSR anchor line Spines. See pages 31-33 of this
®
FSR Spine main line through.
®
®
FSR Inspection:
®
39
FSR Ribs
®
FSR components
FSR procedure and
®
Flow
®

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPM Flow Line and is the answer not in the manual?

Questions and answers

Table of Contents