FINAL SPM
INSPECTION
(Always done before energizing the flow line)
A) Make sure that the main SPM
that all SPM
to an appropriate anchor. This is important. If there is a break in
the flow line, any discontinuity in the SPM
flow line components to move violently.
B) Check that all SPM
process should be monitored carefully during the SPM
installation. Tightening the SPM
generally more time consuming.)
C) Ensure that the SPM
lines are as taut as possible.
D) Make certain that there are no sharp edges that could wear
down, fray, or otherwise sever any of the SPM
This is especially true at anchor points such as a Truck or Trailer
Frame.
E) Bleed-off (or blowback) lines should be secured with the SPM
FSR System in the same manner as the main flow line.
NOTE: It is imperative that all SPM
inspected before each installation. Damaged or otherwise
unusable SPM
replaced.
FSR SYSTEM
®
FSR main lines and anchor line ends are secured
®
FSR Rib installations are tight. (NOTE: This
®
FSR main line and SPM
®
FSR components should be discarded and
®
FSR line is continuous, meaning
®
FSR Ribs at a later stage is
®
FSR components are
®
36
FSR line could allow
®
®
FSR anchor
®
FSR lines.
®
FSR
®
Need help?
Do you have a question about the SPM Flow Line and is the answer not in the manual?
Questions and answers