GENERAL INSTALLATION NOTES FOR
SPM
FLOW LINE SAFETY RESTRAINT
®
SYSTEM (FSR)
Installation of individual SPM
system itself should be done by Weir Oil & Gas personnel or
persons qualified by Weir Oil & Gas to do so. Training is available
from Weir Oil & Gas. Contact us at 1-800-342-7458 for more
information.
Any misuse of the SPM
improper installation shall void any and all warranties and may
cause injury or death. Further, any mishandling of the SPM
such as not following the maintenance and care instructions
contained in this guide, including but not limited to exposing the
SPM
FSRs to excessive heat, shall void all warranties.
®
Prior to installation, verify that the tag indicates its recent
inspection date. For most efficient setup, install SPM
and Spines in unison with the flow line rig-up. After SPM
installed, check every connection, every link, and every SPM
component to ensure that there is a continuous connection from
anchor point to anchor point.
• As a note for standardization the annual inspection and tag
punch represents when the inspection is done.
After the complete SPM
a) All SPM
®
flow line components.
b) All main line and anchor line SPM
possible from anchor point to anchor point.
Always keep ALL personnel away from the flow line while under
pressure. This applies whether or not a restraint system is
installed.
FSRs such as lifting or towing, or
®
FSR system is installed, make sure:
®
FSR Ribs are installed as tight as possible around
FSR components as well as the
®
FSR Spines are as tight as
®
13
FSRs
®
FSR Ribs
®
FSR is
®
FSR
®