Keys To A Successful Installation
Electrical:
The power switch has a built-in circuit breaker. To reset it, turn to the "OFF" position, and then back to the
"ON" position.
The wiring diagram for the dispenser is located on the inside of the cover.
Plumbing:
The water line must be flushed thoroughly prior to connecting it to the dispenser to prevent debris from
contaminating the machine. An in-line water filter is strongly recommended.
Verify that the water line will provide at least 1.5 gallons per minute before connecting it to the dispenser.
The end of the vent tube must be open to the air, not connected to anything or submerged in liquid.
General:
The installation must comply with applicable federal, state, and local codes having jurisdiction at your
location.
Utilize only qualified beverage equipment service technicians for installation. A Service Company Directory
may be found on our web site, http://www.fetco.com.
Do not adjust the thermostat settings unless absolutely necessary. They are set at the factory for optimum
performance.
Installation Instrucions
Setup
1. Before placing the unit, verify that it will fit in the space intended for it, and
that the counter or table will support its' weight.
2. Place the unit on its back and screw in the legs.
3. Place the unit on the counter or stand.
4. When the unit is in position, level it front to back as well as side-to-side by
adjusting the legs.
5. Mark the surface of the counter with the location of the mounting holes in the legs.
6. Drill ¼" diameter holes in the counter and secure the legs to the counter with bolts and nuts (not included).
Water Connection
1. The water inlet is a 3/8" male flare fitting.
2. The dispenser can be connected to cold or hot water. Cold water is preferred for best flavor, but hot water will
allow for faster recovery times. Use of an in-line water filter is strongly recommended.
3. Install a shut off valve near the unit to facilitate service. If an in-line water filter is used, it should be installed
after the water shut off valve and in a position to facilitate filter replacement.
4. Flush the water supply line and filter before connecting it to the unit.
5. Verify that the water line provides at least 1.5 GPM, and that the water pressure is between 20 and 75 psig.
Vent Tube Connection
1. Condensation and steam from the water tank is discharged from the 3/8-inch hose barb fitting on the back of
the unit.
2. Attach a hose (not provided) to the fitting and run it to a drain, sink or a container. The end of the vent tube must
be open to the air, not connected to anything or submerged in liquid.
Electrical Connection
1. Verify that the actual voltage at the electrical service connection is compatible with the specifications on the
unit's serial number label.
2. The temperature and water tank fill level are pre-set at the factory. There is no need to turn off the heaters
during the installation process. The control board disables the heaters until the tank is full of water. The
heating process will start automatically when the tank has filled.
All manuals and user guides at all-guides.com

Installation

Installation
Installation
Installation
(For Qualified Service Technicians Only)
4
Warning: Legs are to be
adjusted only for
leveling the unit.
Do not extend them
higher than
necessary.

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Hwb-10