Receiving And Storage - Daikin VHF Installation And Maintenance Manual

Vertical stack water source heat pumps
Table of Contents

Advertisement

Receiving and Storage

Upon receipt of the equipment, check the carton and pallets
for visible damage. Make a notation on the shipper's delivery
ticket before signing. If there is any evidence of rough handling,
immediately open the cartons to check for concealed damage.
If any damage is found, notify the carrier within 48 hours to
establish your claim and request their inspection and a report.
The Warranty Claims Department should then be contacted.
Cabinet Stacking (1 unit per crate)
Do not stack over three crates high at any time during trans-
portation or storage.
Unit front
Note: Packaging has been tested and certified in accordance with the
International Safe Transit Association (ISTA), test procedure 3B.
Table 1: Cabinet packaging overall dimensions
Unit Size
With Risers
1
009-012
Without Risers
With Risers
1
015-018
Without Risers
With Risers
1
021-036
Without Risers
1
Note:
Risers are factory supplied with cabinet for field installation.
IM 986-11 • Vertical Stack WSHP
Risers
Unit back
Pallet front
Risers are factory supplied with
cabinet for field installation.
18 x 18
21"W x 29"H x 91.50" to 124.50"L
21"W x 27"H x 91.50" to 107.50"L
_
_
_
_
Chassis (4 per skid)
Do not stack over two skid high at any time during transporta-
tion or storage. For storing, each carton is marked with "up"
arrows.
Storage and Operating Environment
Temporary storage at the job site must be indoor, completely
sheltered from rain, snow, etc. Units should not be installed in
environments that fall below freezing or exceed 140°F ambient.
Cabinet Size
18 x 20
21"W x 31"H x 91.50" to 124.50"L
21"W x 29"H x 91.50" to 107.50"L
6
r
s
eCeiving and
torage
24 x 24
27"W x 35"H x 91.50" to 124.50"L
27"W x 23"H x 91.50" to 107.50"L
www.DaikinApplied.com