Air Conditioning Installation - Piper PA-28-181 Archer II Pilot Operating Handbook

Hide thumbs Also See for PA-28-181 Archer II:
Table of Contents

Advertisement

PIPER
AIRCRAFT CORPORATION
SECTION
9
SUPPLEMENTS
PA-28-L81,
ARCHER
II
SUPPLEMENT
1
AIR CONDITIONING INSTALLATION
SECTION
I..
GENERAL
This
supplement supplies
information
necessary
for
thc
etTicient
opera-
tion
of
the airplane when the optional
air conditioning
system
is
installed.
The information contained
within this
supplement
is to
be
used
"as
clescribed"
in
conjunction
with
the
complete handbook.
This
supplement
has been
"FAA
Approved"
as a
permanent part
of
this
handbook and
must remain
in
this
handbook
at
all
times when the
optional
air
conditioning
system
is installed.
SECTION
2.
LIMITATIONS
(a)
To
insure
tnaximum
climb
performance the
air
conditioner
must
be
turned OFF manually
prior to
takeoff
to
disengage
the
compressor
and
retract the
condenser
door.
Also the air conditioner
must
be
turned
OFF
manually betore the
landing
approach
in
preparation
for
a
possible go-around.
(b)
Placards
In
Ml
view
of
the
pilot,
in
the
area
of
the
air
conditioner
controls
when
the
air conditioner is installed:
..WARNING
- AIR
CONDITIONER MUST
BE OFF TO INSURE NORMAL TAKEOFF
CLIMB
PERFORMANCE.''
Irr
full
view of
the
pilot,
to the
right
ol'the
engine
gauges (condenser
door
light):
..AIR
COND
DOOR
OPEN''
REPORT:
VB-1120
9'3
ISSUED:
JULY
2,1979

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents