Installation - Whale INSTANT MATCH SDP134T Installation Manuallines

With bluetooth wireless technology kit
Table of Contents

Advertisement

umbing of the Waste Pipe

Installation

1. Plumbing drainage pipe
• Run 15mm pipe from gulley to pump inlet (max 3m).
• Use slow radius bends where possible. Full size elbows
are acceptable, not stem or Male/Female elbows. Where
possible avoid attaching elbows directly to the pump.
2. Locating your pump on the wall
• Select a suitable location for the pump, considering
the best plumbing option for the pump outlet to
discharge into the waste pipe. The pump head may
be rotated to the left hand side or right hand side.
• Mount square to wall.
• Using a spirit level ensure that the unit is mounted level.
• Do not install the pump inlet/outlet more than
500mm off the floor.
• NOTE: The pump and transformer mounting location
on the backplate may be swapped right to left / left to
right. See Page 18 for further information.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents