Installation and start-up
Requirements:
Coffee machine installed and connected to
water and power supply.
See chapter 1.1 – 1.2.2
Basic setting
Switch on the machine. Check the start-up date and time and
change them if needed and confirm the start-up date.
Confirmation is requested only when switched on for the first
time.
The date setting starts the maintenance counters and service
intervals.
The machine fills up automatically and heats up
Language selection
Enter the measured water hardness on the information pad
Activate any pre-rinsed water filter under System and enter the
filter capacity taken from the cutting table.
Check machine options and correct if necessary:
Power Class, Low pressure, RDA, External Tank, Accounting ...
Enter the Service address(es)
Enter the machine name for the data back-up filename.
E.g.: Serial number and name of the company
Check date and time
(One-time query when switched on for the
first time)
Caution: The date can NOT be changed
later!
System
>
Language
System
>
Water filter
(Service PIN must be entered)
Service
>
Machine configuration
(Service PIN must be entered)
Service
>
Service address(es)
Service
>
Machine master data