Installation And Start-Up; Customer's On-Site Connection Requirements - WMF espresso Service Manual

Table of Contents

Advertisement

Installation and start-up

1
Installation and start-up
1.1

Customer's on-site connection requirements

Necessary preparatory work for electricity, water and drainage connections at the customer's premises are to be arranged by the machine owner/operator.
The work must be carried out by authorised installation technicians in compliance with general, country-specific and local regulations.
The WMF Service engineers may only connect the coffee machine to existing prepared connection points.
WMF Service is neither authorised nor responsible for carrying out any work on-site prior to connection.
For details, see the planning information on the website
www.wmf-kaffeemaschinen.de
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents