Verification Procedure
The following verification procedures assume you understand how to operate the ac source from the front
panel as explained in chapter 4.
Perform the following tests for operation verification in the order indicated.
1. Turn-On Checkout
2. Voltage Measurement Accuracy
3. Current Measurement Accuracy
NOTE:
The ac source must pass turn-on selftest before you can proceed with the verification.
Test Set up
Agilent 3458A
DMM
R = Load resistor for CC test (30 ohms)
L
Rs = Current Monitor resistor (0.01 ohms)
A.
Agilent 33120A
FUNCTION GENERATOR
Agilent 3458A
DMM
C1 = Capacitor (1.0 uF)
B.
HI
LO
R
Rs
L
HI
C1
LO
Figure B-1. Verification / Calibration Test Setup
Agilent 6811B/6812B/6813B
LO HI
I
SENSE
MAIN OUTPUT
SENSE
01
01
HI
Agilent 3458A
DMM
LO
Agilent 6811B/6812B/6813B
LO HI
|
I
SENSE
MAIN OUTPUT
SENSE
COM
01
01
|
LO HI
V
SENSE
POWER ANALYZER
COM
COM
LO HI
V
SENSE
POWER ANALYZER
COM
23