66 | Fitting

10
Fitting
10.1

Transport and handling

10.1.1

Delivery method and transport options

The UNIMAT UT-L boiler and UNIMAT UT-L boiler with
integrated heat exchanger are each delivered in a
transport unit.
10.1.2

Handling dimensions

For handling the boiler, it is essential to size the
entrance to the installation room slightly larger than the
boiler dimensions. See tab. 29 for the minimum handling
dimensions.
UNIMAT UT-L boiler
Boiler size
UT-L 1
UT-L 4
UT-L 10
UT-L 14
UT-L 18
UT-L 24
UT-L 28
UT-L 30
UT-L 34
UT-L 40
UT-L 42
UT-L 46
UT-L 50
UT-L 54
UT-L 58
UT-L 60
UT-L 64
Table 29 Minimum handling dimensions for UNIMAT UT-L boilers; the dimensions specified are recommended values and
may vary from system to system.
6 720 807 794 (2013/04)
UNIMAT UT-L boiler
Minimum width Minimum height Minimum width Minimum height
[mm]
1400
UT-L 2
1550
UT-L 6
1650
UT-L 8
1750
UT-L 12
1800
UT-L 16
1900
UT-L 20
1950
UT-L 22
2050
UT-L 26
2150
UT-L 32
2350
UT-L 36
2500
UT-L 38
2650
UT-L 44
2800
UT-L 48
2950
UT-L 52
3120
UT-L 56
3450
UT-L 62
3650
Transport
To transport the boiler block with a crane, only use the
two lifting eyes. These are fitted at the top of the boiler
pressure body, at the front and back.
The use of rollers underneath the base frame to
transport the system at floor level is not permitted.
There is a danger that the base frame will become
warped.
Entrance
UNIMAT UT-L boiler with flue gas
[mm]
1850
2000
2100
2200
2250
2350
2400
2500
2600
2800
2950
3100
3300
3400
3650
3950
4150
heat exchanger
[mm]
[mm]
1500
1865
1650
2015
1755
2115
1855
2215
1910
2265
1995
2365
2060
2415
2155
2515
2250
2615
2435
2800
2605
2950
2750
3100
2905
3250
3045
3400
3240
3600
3555
3900
3750
4100
UNIMAT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents