10.6

Further accessories

10.6.1
Drain connection and blow-down valve
assembly
To enable the boiler to be drained quickly and, if
required, the boiler sludge to be removed, we
recommend a drain connection as shown in Fig. 56.
Fig. 56 Design of the drain connection for UNIMAT UT-L
boilers
[1]
UNIMAT UT-L boiler
[2]
Boiler drain
[3]
Drain valve
L
2
Fig. 58 Dimensions of the walk-on boiler cover for UNIMAT UT-L boilers; rail and ladder are optional (dimensions in mm)
[1]
Rail (optional)
[2]
Ladder on either the left hand or right hand side
(optional)
UNIMAT
1
2
3
6 720 642 347-70.1il
L
1
660
10.6.2

Walk-on boiler cover

As additional equipment, Bosch offers a walk-on boiler
cover. Also available with this are a ladder and safety rail
with toe board. The walk-on boiler cover is already fitted
when the boiler is delivered. The safety rail and ladder
are to be fitted on site. The ladder can be mounted on
the left hand or right hand side of the boiler. Please
specify which side when ordering the walk-on boiler
cover. In the case of gas combustion, the ladder should
be fitted opposite the gas train.
Fig. 57 Walk-on boiler cover
B
1005
H
Fitting | 79
6 720 642 347-84.1il
1
2
6 720 642 347-71.1il
6 720 807 794 (2013/04)