Download Print this page

Raychem FTC-XC Installation Instructions page 4

Power connection and end seal kit

Advertisement

4
FTC-XC Installation Instructions
End Seal Installation for XL-Trace -CR and -CT, and RaySol Heating Cables
1
Clearly cut off the end of cable.
Score down and around outer
jacket 1 inch from the end.
Remove the outer jacket.
Do not cut or damage inner jacket. If
damaged, remove damaged section and repeat step 1.
3
Insert end of cable in junction box.
Install junction box.
Firmly push end seal completely
onto heating calbe (at least 1 1/2
inches). Some gel may ooze out.
Do not twist or try to remove the
end seal during or after insertion.
Do not reuse an end seal.
Note: The end seal is designed to
be installed only once; it cannot be
removed from the heating cable
once installed.
Typical XL-Trace Direct Buried Pipe Application
Power connection box
3/4 in conduit
Waterproof thermal insulation
Worldwide Headquarters
Tyco Thermal Controls
307 Constitution Drive
Menlo Park, CA 94025-1164
USA
Tel 800-545-6258
Tel 650-216-1526
Fax 800-527-5703
Fax 650-474-7711
info@tycothermal.com
www.tycothermal.com
End seal box
Tyco, RaySol, and XL-Trace are trademarks of Tyco Thermal Controls LLC or its affiliates.
Important: All information, including illustrations, is believed to be reliable. Users, however,
Canada
should independently evaluate the suitability of each product for their particular application.
Tyco Thermal Controls
Tyco Thermal Controls makes no warranties as to the accuracy or completeness of the
250 West St.
information, and disclaims any liability regarding its use. Tyco Thermal Controls' only obligations
Trenton, Ontario
are those in the Tyco Thermal Controls Standard Terms and Conditions of Sale for this product,
Canada K8V 5S2
and in no case will Tyco Thermal Controls or its distributors be liable for any incidental,
Tel 650-216-1526
Fax 800-527-5703
indirect, or consequential damages arising from the sale, resale, use, or misuse of the product.
Specifications are subject to change without notice. In addition, Tyco Thermal Controls reserves
the right to make changes—without notification to Buyer—to processing or materials that do not
affect compliance with any applicable specification.
2
Remove exposed braid.
4
Attach Warning label to
junction box cover.
Typical RaySol Floor Warming Application
Power connection box
3/4 in conduit
W A
F ir
R N
e a
I N
n d
S h
G
S e
h e a
lf re
o c k
ti n g
g u la
c a b
H a
D is
ti n g
le a
z a r
c o n
e le
n e c
tt a c
c tr ic
d
t b e
h e d
a l
fo re
to th
R a
y c h
is p
s e rv
ip e
e m
ic in
g
End seal box

Advertisement

loading