Pressure Test Point On Housing (Optional); Connecting The Piping; (Optional) - Honeywell BK V2 Operating Instructions Manual

White meters, component of a diaphragm gas meter
Table of Contents

Advertisement

▷ If the meter is stored outdoors, protect the site
against rain.
▷ If the drive area (magnetic coupling) is protected
against the ingress of moisture by an index, then
the meter is also suitable for outdoor installation.
 Remove protective caps.
▷ Installation in the vertical position: connectors
must be pointing upwards.
▷ Note direction of flow (arrow).
▷ After installation, the completed gas meter must
not be in contact with masonry or other parts.
▷ Ensure that there is sufficient installation space.
▷ The seal faces on the screw unions must be
clean and damage-free.
▷ Ensure that the seal is correctly seated.
▷ For the compression of seals and the resulting
tightening torques for the screw unions, the seal
manufacturers' specifications must be observed.
Tightening torques for the recommended flat
seals in conjunction with screw connectors
pursuant to DIN  3376-1 and  3376-2, see
www.docuthek.com → Elster-Instromet → Prod-
ucts → Gas measuring devices → Diaphragm
meters → Ergänzung für Betriebsanleitung BK,
Verschraubungen und Anzugsmomente für BK-
G1,6 bis BK-G25 (Supplement to BK operating
instructions, Screw unions and tightening tor-
ques for BK-G1.6 to BK-G25) (D).
 Install the meter free of mechanical stress.
Temperature test point
▷ Temperature sensors can be inserted into the
thermowells for measuring the gas temperature
in the meter housing.
1
2
 Secure each of the temperature sensors using
the capstan screw provided.
Pressure test point on housing

(optional)

Connecting the piping

WARNING
In order to ensure that the meter is tight:
The pressure test nipple must not be twisted,
bent, or otherwise manipulated.
When installing, always secure the pressure test
nipple using a suitable spanner.
▷ Functional safety and reliability are ensured only if
the material combination of the screw connector
and the pressure line are inter-matched.
▷ Only use the olive and the attached union nut
supplied. The olive is secured to the sealing
sleeve.
▷ When re-ordering, use original Parker EO pro-
gressive ring fittings PSR/DPR.
1
1
4
4
▷ Use corrosion-resistant, seamless precision steel
6
tube pursuant to DIN EN 10305-4 (external di-
ameter 6 mm, material E235 = 1.0308). For other
materials, use a suitable adapter and note the
Parker/EO recommendations.
▷ Install pipes free of mechanical stress.
6
8 Screw on the union nut by hand as far as it will
go.
▷ At the same time, press the end of the pipe firmly
against the stop.
9 Mark the position of the union nut and tighten
with about 1½ turns.
GB-4
2
3
2
3
5
5
7
7