Page 3
. Make sure that the user of the vessel is supplied with the owner’s manual . vetus® Operation manual and installation instructions bow thrusters BOW6012D and BOW6024D 020547.04...
Page 4
Outboard Gear 12 - 15 Nm inserting and tightening them. Grease (9 - 11 ft.lbf ) Check for possible leaks immediately the ship returns to wa- ter . vetus® Operation manual and installation instructions bow thrusters BOW6012D and BOW6024D 020547.04...
Page 5
• For a first check, turn the propeller by hand, it should turn easily, whilst being connected to the output spindle of the electric mo 12 - 15 Nm tor. (9 - 11 ft.lbf ) Molykote® G-n plus vetus® Operation manual and installation instructions bow thrusters BOW6012D and BOW6024D 020547.04...
If there are two steering positions, the second control panel can be connected to the first one. vetus® Operation manual and installation instructions bow thrusters BOW6012D and BOW6024D 020547.04...
Page 7
The instructions of the manufacturer should be followed for the maintenance of the batteries. Vetus batteries are maintenance free. vetus® Operation manual and installation instructions bow thrusters BOW6012D and BOW6024D 020547.04...
4 min. continuously or max. 4 min. per hour at 300 A (12 Volt). See table on page 69 4 min. continuously or max. 4 min. per hour at 165 A (24 Volt). vetus® Operation manual and installation instructions bow thrusters BOW6012D and BOW6024D 020547.04...
et op ttenzione Het is zeer belangrijk dat het gatenpatroon exact op de hart- È molto importante che la disposizione dei fori si trovi esat- lijn van de tunnelbuis ligt . tamente sulla linea mediana del tunnel dell’elica . Gebruik de tussenflens of een stuk hoekprofiel om te controle Utilizzare la flangia intermedia o un pezzo angolare per con...
Kahden keukapotkurin ohjaus samanaikaisesti yhdellä Manejo simultáneo de 2 tornillos de retención con 1 panel panelilla . (12 V (12 V / 24 V) / 24 V) vetus® Operation manual and installation instructions bow thrusters BOW6012D and BOW6024D 020547.04...
2 x 55 Ah - 12 V 2 x 70 Ah - 12 V 0 57 ft AWG 4 2 x BCI 90 - 500 2 x BCI 91 - 650 vetus® Operation manual and installation instructions bow thrusters BOW6012D and BOW6024D 020547.04...
BP1020 Pakking 2 mm Gasket 2 mm BP1021 Pakking 1 mm Gasket 1 mm TS110 Thermische beveiliging Thermal Protection BP256 Reserve zekering 5 A Spare fuse 5 A vetus® Operation manual and installation instructions bow thrusters BOW6012D and BOW6024D 020547.04...
EN 55011 EN 61000 2004/108/EEC 93/68/EEC Schiedam, 20 01 2014 Ing. P.H. le Pair Vetus B .V . Fokkerstraat 571 3125 BD Schiedam The Netherlands vetus® Operation manual and installation instructions bow thrusters BOW6012D and BOW6024D 020547.04...
Page 19
FOKKERSTRAAT 3125 SCHIEDAM HOLLAND TEL.: 4377700 TELEFAX: +31 10 4372673 4621286 EMAIL: sales@vetus.nl INTERNET: http://www.vetus.com Printed in the Netherlands 020547.04 201401...
Need help?
Do you have a question about the BOW6024D and is the answer not in the manual?
Questions and answers