Maintenance & Storage - MAKERGEAR M2 User Manual

Rev g
Hide thumbs Also See for M2:
Table of Contents

Advertisement

Ensure that the heated build platform (HBP) is at the correct height and
properly leveled. To do so, open the MakerGear QuickStart app and fol-
low the Set Up process in order to complete the following steps:
1) Check Starting Height 2) Check HBP Level
Ensure that the glass build plate is free of defects (torn or bubbled
polymide tape) and dust/dirt/grease, and replace tape or clean surface
with appropriate cleaner (alcohol/water at 50%/50% is recommended).
Monthly Maintenance (every 200-250 hours)
Ensure that the printer is free of dust and filament debris, and clean it
if necessary. Focus areas include fans and fan guards, filament surface
and filament drive, and the entire frame. Clean the oil from the X and Y
linear rails and apply a fresh coat to each. A dot of oil in each of the long
grooves on the X and Y rails is sufficient. Once applied, move each axis
through its full travel multiple times to spread the oil.
• If you are using the M2 regularly, turn off and unplug the power
supply when finished.
• If you are storing the M2 for a period of 1-2 weeks, follow the
instructions listed above. Additionally, fully seal the filament spool in
a bag, preferably with a new desiccant packet inside.
• If you are storing the M2 for a period of 2 weeks or more, follow all
above instructions, THEN cover the entire printer in order to protect it
from the buildup of dust and other airborne particles.
DO NOT
unscrew the nozzle directly from the M2. To change or remove
the nozzle, the entire hot end must be removed. Visit our website or the
MakerGear YouTube channel for step-by-step instructions on how to
remove a hot end and change the nozzle.
Maintenance & Storage
Weekly Maintenance (every 50 hours)
M2 Storage
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents