Document Revision History; Related Documents - ABB SAM600-IO Protocol Manual

Switchgear control unit
Hide thumbs Also See for SAM600-IO:
Table of Contents

Advertisement

1MRK 511 440-UEN A
1.3.2
1.3.3
Switchgear control unit SAM600-IO Version 2.2 IEC
Communication protocol manual
describes the process of testing an IED in a substation which is not in service. The
chapters are organized in the chronological order in which the IED should be
commissioned. The relevant procedures may be followed also during the service
and maintenance activities.
The operation manual contains instructions on how to operate the IED once it has
been commissioned. The manual provides instructions for the monitoring,
controlling and setting of the IED. The manual also describes how to identify
disturbances and how to view calculated and measured power grid data to
determine the cause of a fault. The manual provides information related to the need
of LHMI service kit to monitor diagnostics and make configuration changes.
The application manual contains application descriptions and setting guidelines
sorted per function. The manual can be used to find out when and for what purpose
a typical protection function can be used. The manual can also provide assistance
for calculating settings.
The technical manual contains operation principle descriptions, and lists function
blocks, logic diagrams, input and output signals, setting parameters and technical
data, sorted per function. The manual can be used as a technical reference during
the engineering phase, installation and commissioning phase, and during normal
service.
The communication protocol manual describes the communication protocols
supported by the IED. The manual concentrates on the vendor-specific
implementations.
The cyber security deployment guideline describes the process for handling cyber
security when communicating with the IED. Certification, Authorization with role
based access control, and product engineering for cyber security related events are
described and sorted by function. The guideline can be used as a technical
reference during the engineering phase, installation and commissioning phase, and
during normal service.

Document revision history

Document revision/date
A/November 2017

Related documents

Documents related to SAM600–IO
Application manual
Commissioning manual
Product guide
Technical manual
Type test certificate
Table continues on next page
GUID-7099E1DB-1CD6-4037-A418-92AB57FA9462 v1
History
First release
GUID-67D1F667-746E-4B71-875A-4CBEAB6EC5E1 v1
Document numbers
1MRK 511 445-UEN
1MRK 511 447-UEN
1MRK 511 448-BEN
1MRK 511 446-UEN
1MRK 511 448-TEN
Section 1
Introduction
7