Setup Steps - Curtis RSTB Service Manual

Dual dilution/sweet tea
Hide thumbs Also See for RSTB:
Table of Contents

Advertisement

SETUP STEPS

(Continued)
4 Turn on the main power switch (bottom toggle switch, behind the brewer). The heating tank will start to fill. When the water
level in the tank rises to the correct volume, the heating element will energize automatically. This eliminates the possibility of
element burnout caused by an empty tank
5. In the initial warm-up of the heating tank, it will require 20 to 30 minutes to reach operating temperature (204°F). This is indi-
cated when Ready to Brew appears on the LCD screen.
6. Prime the sweetener pump to prepare the unit for brewing. Hold a cup under the dilution spout to catch liquid sweetener. Press
the PRIME button. Hold down the button until sweetener flows from the dilution spout. Release the button. The sweetener pump
is now primed. Perform this at the initial tea brewer setup and thereafter, each time the BIB sweetener is replaced.
7. Run one full brew cycle, to purge the water lines and valves of air. Five seconds of dilution water at the beginning of each brew
cycle is a normal function. This is a default of the system.
8. The unit is now ready to brew tea.
SWEETENER SCHEMATIC LAYOUT
2

Advertisement

Table of Contents
loading

Table of Contents