Download Print this page

Hausmann 1427 Installation & Operation Instructions page 4

Bariatric electric mat platform

Advertisement

2.3 Pump Preparation
Detach pump from work surface. Orient and secure pump in an upright position to prevent
fluid loss during the refill procedure. Be careful not to stretch, kink, or damage the hydraulic
tubing and connections.
Crank Driven Pump (Shown in Upright Position)
3.0 Tubing Disconnection
To disconnect tubing from pump, unscrew and remove the compression nut, ferrule, and tubing assembly which corresponds
with the lift cylinder to be refilled.
To disconnect tubing from cylinder, unscrew and remove compression nut,
ferrule, and tubing assembly from cylinder port. NOTE: CB cylinders will require
the removal of plastic cap to expose the compression nut.
CB Cylinder Shown
4.0 Refill Procedure
®
To refill the pump, fill open port with Movotec
NT15 Hydraulic Fluid to level
indicated below using the filler bottle with needle. NOTE: The pump element will
not fill properly if the filler bottle needle is not inserted past the smallest opening
in the port as shown.
To refill a top-ported cylinder, slowly pull cylinder rod to an extended length of
approximately 4 inches (102mm) from end of cylinder body. Fill open cylinder
®
port with Movotec
NT15 Hydraulic Fluid to level indicated below using the filler
bottle with needle. NOTE: The cylinder will not fill properly if the filler bottle
needle is not inserted past the smallest opening in the port as shown.
Rev. 072514 aj
Page 4 of 7
©2013 HAUSMANN INDUSTRIES, INC.

Advertisement

loading