ESUMN8-P2-B
Quick Start Guide
Rev 1709

Advertisement

Table of Contents
loading

Summary of Contents for KBC ESUMN8-P2-B

  • Page 1 ESUMN8-P2-B Quick Start Guide Rev 1709...
  • Page 2: Table Of Contents

    MOUNTING ..............................8 DIN mounting ..........................8 Wall mounting ..........................8 Items for attention ......................... 9 Grounding ............................9 Cable ................................11 SFP port ............................11 ESUMN8-P2-B Quick Start Guide-Rev1709.docx www.kbcnetworks.com Copyright © KBC Networks Ltd. 2017 Page 2 of 11...
  • Page 3: Introduction

    ESUMN8-P2-B Quick Start Guide INTRODUCTION 1.1 ESUMN8-P2-B INTRODUCTION ESUMN8-P2-B is an unmanaged full SFP Industrial Ethernet switch with 8*100Mbps SFP and 2*1Gbps SFP ports. Industrial level 3 protection design and IP40 enclosure protection makes the product suitable for applications in harsh environments.
  • Page 4 Environment Storage Temperature -40 to +85 C (-40 to 185 Operating Temperature -40 to +75 C (-40 to 167 Operating Humidity 5% to 95% Non-condensing ESUMN8-P2-B Quick Start Guide-Rev1709.docx www.kbcnetworks.com Copyright © KBC Networks Ltd. 2017 Page 4 of 11...
  • Page 5: Panel Views

    WARNING:This product MUST be mounted to a well-grounded mounting surface such as a metal panel. Status indicator LED Color Status Description Orange Power 1 is being supplied ESUMN8-P2-B Quick Start Guide-Rev1709.docx www.kbcnetworks.com Copyright © KBC Networks Ltd. 2017 Page 5 of 11...
  • Page 6 Power 2 is being supplied Orange Power 2 is not being supplied SFP port LINK The corresponding port’s link is active Green Blinking Data is being transmitted ESUMN8-P2-B Quick Start Guide-Rev1709.docx www.kbcnetworks.com Copyright © KBC Networks Ltd. 2017 Page 6 of 11...
  • Page 7: Dimensions (Unit=Mm)

    ESUMN8-P2-B Quick Start Guide DIMENSIONS (UNIT=mm) ESUMN8-P2-B Quick Start Guide-Rev1709.docx www.kbcnetworks.com Copyright © KBC Networks Ltd. 2017 Page 7 of 11...
  • Page 8: Mounting

    ESUMN8-P2-B Quick Start Guide MOUNTING 4.1 DIN mounting Very simple: Press the clamp, insert into rail then loosen hand 4.2 Wall mounting Step 1 Step 2 ESUMN8-P2-B Quick Start Guide-Rev1709.docx www.kbcnetworks.com Copyright © KBC Networks Ltd. 2017 Page 8 of 11...
  • Page 9: Items For Attention

    (e.g. use of power strips). 4.4 Grounding Grounding and wire routing help limit the effects of noise due to electromagnetic ESUMN8-P2-B Quick Start Guide-Rev1709.docx www.kbcnetworks.com Copyright © KBC Networks Ltd. 2017 Page 9 of 11...
  • Page 10 ESUMN8-P2-B Quick Start Guide interference (EMI). Run the ground connection from ground screw to the grounding surface prior to connecting devices. ESUMN8-P2-B Quick Start Guide-Rev1709.docx www.kbcnetworks.com Copyright © KBC Networks Ltd. 2017 Page 10 of 11...
  • Page 11: Cable

    Email: emeatechsupport@kbcnetworks.com APAC China Phone (1): +86 25 5882 1665 Phone (2): +86 25 5882 1656 Email: techsupport@kbcnetworks.com Singapore Phone: +65 9747 5123 Email: apactechsupport@kbcnetworks.com ESUMN8-P2-B Quick Start Guide-Rev1709.docx www.kbcnetworks.com Copyright © KBC Networks Ltd. 2017 Page 11 of 11...

Table of Contents