2. INSTALLATION

2.1. Equipment storage before installation

Prior to installation, be careful to avoid all physical impacts to the equipment. Keep it in its original packaging
and store it in a dry location. Make sure it is protected from dust, heat and harsh weather.
Extreme temperatures of storage: -30 to +80°C [-22 to 176°F].

2.2. List of tools required

Wrench set.
Ratchet set.
500 g hammer.
Percussion drill + drill bit Ø15mm x 100mm (if fixed to the ground with template).
Spirit level.
Forklift.
NAM-TRS372-MT-EN-C
The information in this document is the property of Automatic Systems and is confidential. The consignee withholds from using it for anything other than the use of the products or the execution of the
project to which they belong and withholds from communicating it to third parties without prior written agreement from Automatic Systems. Document subject to change without prior notice.
p5/38

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TRS 372 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents