Operating Procedures - Heat King IDF1000 Operation Manual

Table of Contents

Advertisement

Operating Procedures

BEFORE STARTING THE UNIT
* Ensure there is at least 2 feet (0.7 Meters) of clearance around machine.
* If outdoor temperature is below 14°F or -10°C plug in the engine heater for 2-3 hours before starting.
It requires a 120 VAC / 60 hz power supply.
* Verify engine oil level.
TO START THE UNIT
1. Turn the Battery Disconnect switch - located behind the main door - to the ON position.
2. Turn the "Power" Switch to the ON position and wait for the Home Screen to appear on the display.
3. Two settings are accessible to the user at the display:
* Temperature unit: °C or °F (default)
* Remote Thermostat: YES or NO (default)
To edit the default settings, from the main screen press
corner of the display.
Press
twice to access to the Temperature unit. Use
Press
once to move the cursor to the Remote thermostat line. Use
YES.
Press Esc to return to Main screen.
4. Press and hold the "Engine" switch to the start position. There will be a short delay to prepare the en-
gine
for starting. (indicator light will flash during this time). The colder the ambient, the longer the delay.
If the engine is cold, let it warm up a few minutes before next step.
5. Turn the "Heating Cycle" switch to the ON position. The machine will start now the controlled heating
cycle.
6. Using the corresponding switches, adjust the "Supply Temperature" and "Fan speed" Settings as need-
ed or
leave at the default settings.
TO STOP THE UNIT
1. Turn the "Heating cycle" switch to the OFF position and wait for the Cool Down period to finish.
(indicator light will stop flashing)
2. Press and hold the "Engine" switch to the Stop position until the engine shuts off.
3. Turn the "Power" Switch to the OFF position.
until "Set" appears at the bottom right hand
to toggle between °F and °C.
21
to toggle between NO and