11. Caution! It is essential at this point
that the supply pipework is thoroughly
flushed through before connection to the
mixer. Failure to do so may result in product
malfunction and will not be covered under the
guarantee.
12. Fit the compression nuts and olives onto the
pipework.
13. Align the mixer with the pipework and fit onto
the backplate.
Important! make sure that the hot and cold
inlets on the mixer correspond with the hot and
cold inlet supplies.
compression
nut
olive
14. tighten the compression nuts onto the mixer
with a suitable spanner.
15. tighten the two grubscrews to secure the mixer
to the backplate.
16. Make sure that the flow control (hub) is in the
off position (fully clockwise), turn on the hot
and cold water supplies and check for leaks.
17. For user comfort on high pressure systems,
18.slide the shroud over the mixer and carefully
hub
19. Push on the bearing, then push and hold the
10
a 12 litre/minute flow regulator (supplied) can
be fitted inside the outlet nipple. Make sure
that the flow regulator is fitted correctly (refer
to illustration).
push and hold against the wall, make sure
that the shroud is aligned with the shroud cap
(underneath the mixer) and secure with the
two screws, tighten using a 2.5 mm hexagon
key (supplied).
Caution! do not overtighten.
hexagonal key
securing screws
bearing
control knob
hexagonal key
control knob onto the mixer with the grubscrew
at the bottom. tighten the grubscrew with a
2.5 mm hexagon key (supplied).
Note! the hub must be in the off position (fully
clockwise).