Download Print this page

Hausmann Powermatic 1440 Series Installation & Operation Instructions page 2

Mat platform

Advertisement

Step 1
Place (2) Base Assemblies (A1 and A2) parallel to each other as shown in place on the fl oor in the location where
you want to install the mat platform.
"X" Distance between base plates varies as follows:
Size of Top
6' x 8'
5' x 7', 4' x 7'
4' x 6'
A1 Actuator Wire
(Hard Connection)
rev. 09.09.2009 cjr
Distance Between Plates
52"
45"
39 3/8"
Underside of top (on blanket)
Foot Control
Control Box
Base
Assembly
A1
X
2
110V Power
Cord
A2 Actuator Wire
(Hard Connection)
Base
Assembly
A2
©2009 HAUSMANN INDUSTRIES, INC.

Advertisement

loading

Related Products for Hausmann Powermatic 1440 Series