Test The Installation - Honeywell Domonial CMI Series Installer Manual

Table of Contents

Advertisement

Available languages

Available languages

E

Test the installation

N
Use this procedure to make sure the system is programmed and working correctly.
G
L
Panel test
I
1. On the programming submenu, use
SYSTEM DIAG., and then press
S
The PANEL VERSION screen is displayed.
H
2. Press
3. Check that OK appears next to each line.
Note: Tamper will remain as KO until the panel cover is
replaced. If you press and hold the panel tamper switch,
KO will change to OK.
4. Press
5. Check that OK appears next to each line, and then press
to return to the programming submenu.
6. Press
and then press
7. Check that OK appears next to any installed communication
devices. If a GSM card is installed check that the level is
greater than 15.
Page 15 of 52
to display the PANEL STATUS screen.
to display the DEVICES STATUS screen.
to highlight TRANSM. STATUS,
.
to highlight
.
02/2011

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Domonial cme series

Table of Contents