Please Read This First - Eaton iLumin Plus Installation Quick Manual

Table of Contents

Advertisement

Available languages

Available languages

Please Read This First

The iLumin Plus panels are designed, built and tested to
strict safety regulations. By following the steps listed
below and elsewhere within this guide, you can ensure
safe installation and operation of these controller units.
• The iLumin Plus cabinet must be installed only by a
qualified electrician
• For continued protection against shock hazard replace all
covers and guards after field wiring is completed.
• The installation must comply with the appropriate
electrical codes and regulations in force in your area
• The installation must comply with the appropriate
electrical codes and regulations in force in your area
• The iLumin Plus is designed for indoor installation and
use only. The units can, however, be used to control
appropriately certified exterior lighting fixtures
• Ensure that all wiring used conforms fully to local
specifications and is sufficiently rated for the installation
Ensure that all modules are firmly seated on the DIN rails
before beginning field wiring. To reset a module simply pull
the black tab(s) away from the DIN rail, push down on the
side of the module with the tab and allow the tabs to snap
back into place
• All new wiring must be fully verified before applying power
• The high voltage supply should be fed to the cabinet
via an external isolation breaker with sufficient capacity
for the planned installation.
Remove packaging material and discard before field wiring.
This includes cardboard spacers in small cabinets and plastic
tie wraps used on all SCMR (relay) modules.
SCMR Branch Circuit OCP & SCCR NOTE: Cabinets
containing SCMR modules do NOT include branch circuit
overcurrent protection for switching relays. Suitable
overcurrent protection must be provided by the installer.
Each relay has a default 4kA SCCR rating. Bussman KTK-R
class CC fuse protection can increase SCCR rating. Eaton
offers a full line of fusible panelboards to simplify selective
coordination and SCCR protection.
• Always use at least two people when lifting and
mounting heavy or bulky units
• Ensure that the supply is fully isolated at an external
breaker before opening doors. Test that power has been
removed before starting to handle conductors
• Ensure that high voltage and low voltage wiring remains
separate. The design of the cabinets should allow line
voltage field wiring to exit and enter the knockouts
provided at the top of the cabinet while low voltage wiring
can exit and enter the cabinet through knockouts at the
bottom or lower sides of the cabinets.
Important Points For Consideration
• The cabinets are designed for surface mounting. Consult
Eaton for flush mounting options.
• Use suitable conduits and couplers to link the raceways
to the controller chassis
• Allow adequate space for future maintenance of the unit.
Do not install in a location that will later be difficult to
access
• Cabinets are designed to be mounted vertically
• During operation, the cabinets will produce clicks during
relay switching. Take these matters into consideration
when deciding on a suitable mounting position.
www.eaton.com/lightingsystems
iLumin Plus
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents