INITIAL CHECK

6.2.2
Factory setting
of remote control switch
C A U T I O N
7 INITIAL CHECK
Before installation, check if dewing may occur in the heat
points of the outdoor/indoor temperature and humidity conditions
that the line connecting the plotted points of the outdoor/indoor
temperature and humidity conditions crosses the saturation
according to the local codes and regulations.
Saturation curve
PMML0371A rev.1 - 08/2016
In case that only KPI units are connected in the same HLINK (no
3 4
6 7
3 4
6 7
-
-
The limit of the environmental conditions for using the total
In case that the indoor air humidity is higher than this condition
the unit.
Outdoor Air
Temperature
(DB)
All units
Indoor Air
Indoor Air
Relative
Temperature
Humidity
(DB)
(%)
36
Indoor Air
Absolute
Humidity
(kg/kg)