Electrical Wiring - Hitachi KPI-252E4E Hardware Installation And Operation Manual

Energy recovery ventilation units
Table of Contents

Advertisement

ELECTRICAL WIRING

-
Pour water gradually into the drain pan
-
no water leakage occurs.
5.2 DRAIN PIPE CONNECTION (ONLY FOR KPI-(502-2002)X4E)
1 The position of the drain pipe connection is shown below.
2
3 Fasten the tubing to the drain hose with an adhesive and the
factory-supplied clamp. The drain piping must be performed
4 Insulate the drain pipe after connecting the drain hose to
avoid any condensation.
5
6 ELECTRICAL WIRING
6.1 ELECTRICAL WIRING CONNECTION FOR KPI UNIT
C A U T I O N
9
PMML0371A rev.1 - 08/2016
-
-
Remote control
Transmission wires
Power supply
wires (single
Earth screw
N O T E
After performing drain piping work and electrical wiring, check to
N O T E
N O T E
C A U T I O N
TB
PCB1
Plug
PCB2

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the KPI-252E4E and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents