Download Print this page

Flowserve Durametallic X-200 Installation Instructions Manual page 6

Cartridge dual metal bellows seal for standard and big bore ansi pumps

Advertisement

Tighten the set screws
2.5
on the X-200 cartridge
collar with the Allen
wrench provided,
Figure 5.
Remove setting
2.6
devices by removing
the cap screws with the
Allen wrench provided,
Figure 6. Save the
setting devices for use
if pump impeller must
be reset or if the X-200
is removed for mainte-
nance.
Turn the shaft by hand
2.7
to ensure free operation.
2.8
Pipe up the gland
connections to the
X-200 seal, see
section 3.
See Operational
2.9
Recommendations,
section 4, before
starting pump.
6
Tighten drive collar set screws
Figure 5
Remove setting devices
Figure 6

Advertisement

loading