Download Print this page

Operation - Flowserve Durametallic X-200 Installation Instructions Manual

Cartridge dual metal bellows seal for standard and big bore ansi pumps

Advertisement

4

Operation

Following these recommendations will ensure maximum MTBPM of the
X-200 seal.
Do not exceed corrosion limits. The X-200 is designed to resist
4.1
corrosion by most chemicals. However, do not expose the X-200
materials of construction to products outside of their corrosion lim-
its. The X-200 assembly drawing lists the materials of construction.
For chemical resistance ratings consult Flowserve.
Do not exceed the Pressure-Velocity (P-V) limits.
4.2
Do not exceed the temperature limits of the X-200. The materi-
4.3
als of construction are listed on the assembly drawing. For the tem-
perature limits of materials consult Flowserve. Turn on any cooling
water to the supply tank before start-up.
Do not start up or run the X-200 dry. Buffer / barrier fluid must be
4.4
in the seal cavity at all times during pump operation.
For special problems encountered during installation, contact your
nearest Flowserve Sales and Service Representative or Authorized
Distributor.
10

Advertisement

loading