4. Installation opening
Recommended installation opening
5. Statement of installations
Installation in the solid wall (ceiling) construction of fire compartment
Installation in the solid wall construction of fire
compartment. Damper blade is in vertical position.
5
4
3
2
1
6
Position
1
Damper SEDM
2
Solid wall construction
3
Mineral stone wool, density 140 kg/m
4
Fire protection mastic, thickness 1 mm
5
Cement lime plate, thickness 15 mm, density 870 kg/m
6
Hinges
NOTICE
The actuating mechanism cover must be removable after the installation.
NOTICE
*Dimensions for damper with actuating
mechanism InMax 50.75
Installation in the solid wall construction of fire
compartment. Damper blade is in horizontal position.
5
4
3
2
1
6
3
3
4