13 PACKAGING REMOVAL / REMOVAL FROM PALLET
Evomod 250, 500, 750
The boiler is delivered on a wooden pallet with protective cardboard packing pieces at the front. The side panels & bottom side
panels are contained within cardboard packs strapped to the sides of the boilers. The footer is contained in a cardboard box,
strapped to the boiler, or placed on the flue header pallet. All condensate traps are individually boxed & stored within the footer
box. A protective plastic wrap protects the contents of the pallet. The flue components are in a cardboard box on a separate pallet.
The water connection kit (250) comes in a separate box, the header kits (500, 750, 1000) come on a separate pallet.
Evomod 1000
This boiler comes packed as above except the boiler is split onto 2 pallets. The header assembly comes split across 2 pallets + a
gas manifold.
LIST OF PACK CONTENTS
1. Boiler on pallet(s)
2. Side panel pack(s)
3. Footer pack(s) inc. condensate
traps
4. Flue components
16

INSTALLATION

To unpack the boiler:
Remove the plastic wrap
Unstrap and remove side panel boxes, store in a safe place
Lift off footer box, store in a safe place
Retrieve the condensate trap boxes from within the footer box, store in a safe
place.
Remove the protective cardboard packing from the front.
Remove all screws from the wooden pallet & disassemble the pallet.