Epcom EPIG1K User Manual page 28

Pv grid-connected inverter
Table of Contents

Advertisement

No Utility
Input Voltage
too High
Leakage current Fault
AC Under
Corrective measures
Freq
Check the grid connection and contact
the distribution grid operator if necessary.
tolerable range, but disturbances are still
displayed, contact the SYSCOM / EPCOM
Service line.
Utility is not available. This can occur if the
AC fuse is broken, No AC connections
from utility system, or broken AC cables.
Corrective measures
Island
Check the Utility system and the AC
connections of the PV Inverter
Check the AC fuses of the PV Inverter
Inverter and contact the system installer.
Input voltage higher than 450V. The
inverter could be damaged.
Corrective measures
PV Over
Disconnected PV modules immediately.
voltage
Check the configuration of the strings
for the PV modules in order to ensure the
maximum input voltage is lower than
450V.
Leakage current on ground conductor is
too high
Corrective measures
High Iac
especially the grounding cables. Ensure
Leakage
all the cables are connected properly.
Restart the PV Inverter.
Inverter and contact the system installer.
If the power frequency is within the
If failure remains, disconnect the PV
Check the AC Cables Connections,
If fault remains, disconnect the PV
26>>

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EPIG1K and is the answer not in the manual?

This manual is also suitable for:

Epig2k

Table of Contents