10 www.electrolux.com
Fig.53
Insulating
material
Put as deep as possible
Downward declivity
lower than 1/100
2.
Drainage test
Check whether the drain pipe is
unhindered.
New built house should have this
testdone before paving the ceiling.
Wiring
CAUTION!
The appliance shall be installed in
accordance with national wiring
regualtions.
The air conditioner should use separate
power supply with rated voltage.
The external power supply to the air
conditioner should have ground wiring,
which is linked to the ground wiring of
the indoor and outdoor unit.
The wiring work should be done by
drawing.
An all-pole disconnection device which
has at least 3mm separation distance
in all pole and a residual current
device(RCD)with the rating of above
wiring according to the national rule.
Do not turn on the power until you have
checked carefully after wiring.
1.5m~2m
Downward declivity
lower than 1/100
Bend
S shape
(about 10cm)
VP30
Connect the cable
The installation bearer of sensing device
rotated to another side, and then takes
off cover of electrical box. (Take off the
electrical box if the capacity is 18000btu/h
as well as using network function.)
Fig.54
Installation bearer of
sensing device
Note: All the pictures in this manual are for
explanation purpose only. They may be
slightly different from the air conditioner
you purchased (depend on model). The
actual shape shall prevail.