Table 26: Gas Rate Cubic Feet Per Hour
Seconds for
One Rev.
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
50
52
54
56
58
60
NOTE: To find the Btu input, multiply the number of cubic feet
of gas consumed per hour by the Btu content of the gas
in your particular locality (contact your gas company for
this information as it varies widely from area to area).
EXAMPLE
By actual measurement, it takes 19 seconds for the hand on a 1
cubic foot dial to make a revolution with a 192,000 Btuh furnace
running. To determine rotations per minute, divide 60 by 19 =
3.16. To calculate rotations per hour, multiply 3.16  60 = 189.6.
Multiply 189.6  1 (0.5 if using a 1/2 cubic foot dial) = 189.6.
Multiply 189.6  (the Btu rating of the gas). For this example,
assume the gas has a Btu rating of 1050 Btu/ft.
199,000 Btuh is within 5% of the 192,000 Btuh rating of the
furnace.
58
Size of Test Dial
1/2 cu. ft.
1 cu. ft.
180
360
150
300
129
257
113
225
100
200
90
180
82
164
75
150
69
138
64
129
60
120
56
113
53
106
50
100
47
95
45
90
43
86
41
82
39
78
37
75
36
72
35
69
34
67
32
64
31
62
30
60
3
. The result of
Manifold Gas Pressure Adjustment
This gas furnace has two heat stages. Therefore, the gas valve
has two adjustment screws located under a plastic protective
cover. The second stage (100% input) adjustment screw is
adjacent to the "HI" marking on the valve and the first stage
(60% input) adjustment screw is located adjacent to the "LO"
marking on the valve (See Figure 35).
Manifold pressure adjustment procedure.
Adjust second stage (100% input) pressure first, then adjust
first stage (60% input) pressure.
1.
Turn off all power to the unit.
2.
Using the outlet pressure port on the gas valve, connect a
manometer to monitor the manifold pressure.
3.
Remove plastic cap covering HI and LO pressure
adjustment screws.
4.
Turn on power to the unit.
5.
Set thermostat to call for second stage heat and start
furnace.
6.
If necessary, using a screwdriver, turn the second stage
adjustment screw (adjacent to the "HI" marking on the
valve) clockwise to increase manifold pressure or
counterclockwise to decrease manifold pressure. Be sure
not to over-fire the unit on second stage.
7.
After the high manifold pressure has been checked, adjust
the thermostat to call for first stage heat.
8.
If necessary, using a screwdriver, turn the first stage
adjustment screw (adjacent to the "LO" marking on the
valve) clockwise to increase manifold pressure or
counterclockwise to decrease manifold pressure. Be sure
not to under-fire the unit on first stage.
9.
Once pressure has been checked, replace the plastic cap
covering the HI and LO pressure adjustment screws.
NOTE: When using natural gas, the manifold pressure for
second stage (100% input) should be 3.5 IWG ± 0.3.
The manifold pressure for first stage (60% input) when
using natural gas should be 1.5 IWG ± 0.3.
Table 27: Gas Heat Stages
# of Burner Tubes
4
6
8
2nd Stage Input
1st Stage Input
(100% Btuh)
(60% Btuh)
120,000
72,000
180,000
108,000
240,000
144,000
Johnson Controls Unitary Products

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zj090Zj102Zj120Zj150

Table of Contents