Download Print this page

Confer Plastics CCX-AG Assembly And Installation Manual page 4

Confer above ground curve step / above ground curve step system

Advertisement

Step 13
To install the lower
handrail posts [E] first
locate the openings on
part [A] just below the
second tread marked with
#4. Next insert the tabs
on part [E] all the way into
the openings then tap
down with a rubber mallet
until seated. Repeat to
install the other part [E].
Step 15
Place one of the deck
connectors [F] over the
upper handrail post and
slide down. Check to
make sure side marked
[This Side down] is
facing downward.
Repeat to install the
second part [F]
Step 17
With a helper place the pool step into swimming pool.
Hold the step under water at a slight angle until all the air
bubbles stop. Tilt the step in the other direction until all the
air bubbles stop. Be patient this process will take a
few minutes.
If the pool step is still floating all of the air is not out.
Lean step to the side again until air bubbles stop.
4
Step 14
To install the upper
hand rail posts [E]
first locate the
openings on panel
extension [D] marked
with the #4. Next
insert the tabs on
part [E] all the way
into the
openings then tap
down with a rubber
mallet until seated.
Repeat to install the
other part [E] .
Step 16
Place handrails [G]
over the top of handrail
posts, push down to
lock in place.
Step 18
With the step in place and positioned about 1 inch away
from the inside of pool wall [back of step must not touch
pool liner] extend the two deck connectors onto the pool
deck and attach using 2-#10 x 1-1/4" self tapping screws in
each connector. These screws should be spaced as far
apart as possible using the holes provided in the deck
connector. Next, attach the two deck connectors to the
handrail posts using 2-#10 x 1-1/4" screws in each post.

Advertisement

loading

This manual is also suitable for:

Ccx-ag system