Step 5
Install the rest of
the curved risers
[C] by flexing the
side panels [A]
outward enough to
insert part [C] tabs
into part [A]. Tap
into place with
rubber mallet.
Step 7
Installing the
Foot Pads [H]:
If swimming
pool has a flat
bottom, all four
foot pads [H] will be installed with the #1 facing up.
If swimming pool has a slight taper towards the
center, the back foot pads will be installed with #1
facing up and the front foot pads with #2 facing up.
Step 9
Determine which
side will be facing
up on the front
foot pads [H],
# 1 for a flat
bottom pool or
# 2 for a pool
with slight taper
towards the
center, install
both parts [H].
IF YOU HAVE THE CONFER CURVE STEP
WITHOUT THE ADD-ON CONTINUE WITH
STEP 11.
STOP!
IF YOU HAVE THE CONFER CURVE STEP
WITH OPTIONAL ADD-ON SKIP STEPS 11-18
AND CONTINUE WITH STEP 19.
Step 11
Install the first
tread [I] by placing
over the tabs on
the side panels as
shown. While
holding part [I]
down on the side
panels tap inward
with a rubber
mallet until locked
in place.
#2
#1
Step 6
Tilt the step
backwards to
expose all four
of the rounded
tabs on the
bottom edges.
Rotate
90°
Step 8
The two back foot
pads [H] will always
be installed with #1
facing up. Place part
[H] over the rounded
tab, strike with a
rubber mallet until
seated onto the
rounded tab. Repeat
to install second
part [H].
Step 10
Each side panel [A]
requires 20 lbs of sand
split between the two fill
holes. Sand is needed
as ballast to hold step
down in the water. Using
a funnel fill the lower hole
completely to the top with
sand. Shake the panel to
help settle the sand, lower
hole must be completely
filled. Pour whatʼs left from
the 20 lbs into the upper
fill hole. Using provided
cap, plug the lower fill hole
only. Upper fill hole must
remain open. Repeat
procedure to fill the
STOP!
second part [A].
Step 12
Repeat to install the second
and third treads [I]. The fourth
[Top] tread [I] will install slightly
different than the previous
three. Install this tread by
placing over the four tabs
located on the panel exten-
sions [D]. Using a rubber
mallet strike the top of the
tread directly over the tabs
until seated. All treads and
risers must be installed in
the same direction.
Pour
Pour
sand into
sand into
funnel.
funnel.
3