Download Print this page

Cradlepoint IBR600 Installation Manual page 2

Hide thumbs Also See for IBR600:

Advertisement

4. Mount the router on the wall behind the WRN monitor. Use the bracket included with the
router, and 2 spare screws from the sign installation hardware kits. If the bracket is not
available, use zip ties to mount on the WRN wall plate
5. If the location does not have a WRN monitor, or the Cradlepoint needs to be located elsewhere
for reasons such as poor cell reception in the waiting room, you must notify PatientPoint and
get approval
6. For a standard install, a small wired network will be created – a schematic of a typical network is
shown below. Note that not all installs will have all the devices shown in the schematic
a. The dashed line in the network room represents a future connection linking the office's
network to the PPT network, at which time the Cradlepoint can be removed. This
connection will NOT be made when the CP is installed
b. Tech will need to make one or two short patch cables to connect the Cradlepoint in the
waiting room to the switch located there and the WRN cpu

Advertisement

loading