Check Items After Installation And Test Operation; Check Items After Installation - Gree GMV-36WL/B-T(U) User Manual

Ultra heat gmv5
Hide thumbs Also See for GMV-36WL/B-T(U):
Table of Contents

Advertisement

Ultra Heat GMV5 User Manual
breaker is 40℃(104℉). If working condition changes, please adjust the specification according to national
standard.

5 Check Items after Installation and Test Operation

5.1 Check Items after Installation

Check Items
Has the unit been fixed firmly?
Has the gas leakage be checked?
Does the unit get proper thermal
insulation?
Does the unit drain well?
Is the voltage in accordance with the
related voltage specified on the
nameplate?
Is the electric wiring and piping
connection installed correctly and
securely?
Has the unit been earthed securely?
Is the power cord specified?
Has the inlet and outlet been
clogged?
Has the pipe length and refrigerant
charging amount been recorded?
Is the communication line
connection installed correctly?
Is the piping connection and valves
states installed correctly?
Conditions Might Happen
The unit may drop, shake or emit noise.
It may cause insufficient cooling/heating
capacity.
It may cause condensation and dripping.
It may cause condensation and dripping.
It may cause malfunction or damage the part.
It may cause malfunction or damage the part.
It may cause electrical leakage.
It may cause malfunction or damage the part.
It may cause insufficient cooling/heating
capacity.
The refrigerant charging amount is not
accurate.
It causes communication malfunction the part.
It may cause malfunction or damage the part.
24