Commissioning Ku4 & Ku5; 9�1 Heater Control Settings - Kaden KU5 Installer Manual

Ducted gas heaters
Table of Contents

Advertisement

Kaden Installer's Manual
Ducted Gas Heaters
9. COMMISSIONING KU4 & KU5
All Kaden heaters have been factory tested, but should be commissioned and adjusted in accordance with the
following instructions to ensure efficient and optimal heating performance.
Remember:
Switch the mains power OFF before touching any wiring.
All these steps must be carried out by a qualified trades person.
If the heater cannot be adjusted to operate in accordance with these instructions, then contact:
1300 4KADEN (1300 452 336)
9.1 HEATER CONTROL SETTINGS
The heater module has 3 push buttons. On the right is a SET button and on the left are the UP and DOWN buttons,
refer to Diagram 22.
KU4 / 5
UP Button
DOWN Button
To change an installer set-up parameter, press and quickly release the SET button, the word "SET" should now
appear on the top line of the screen.
The UP and DOWN buttons may now be used to increase or decrease the value on any setting displayed on the
screen.
By pressing the SET button the display will cycle through the installer set-up parameters in the order, which is
detailed in full in the following section, 9.2 Installer Parameters Control LCD Settings (Table 7) on page 31.
30
For technical support please call.
Control Board
Diagram 22
LCD
SET Button

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ku4Ku3Ke4Ke3

Table of Contents