NMC-DC
10.3 Drain Meter Measurement
Option A- Total Measurement
Option B- Sample Measurement
Collect sample from drain of 1 lateral=simulate the total amount of drain water per valve/shift
Doc. Name: NMC-DC I
(Drain applications for greenhouses)
Installation Manual
Crop Management Technologies
Total Flow
Measure delay:
On delay= time it takes for water to get through the system.
Off Delay= time after irrigation it takes for water to fully drain
and stop drain measurement.
Revision: 01 I
INSTALLATION MANUAL
Sample
Page:
62
of 109 pages