2.2 Wiring of Distribution Box

The distribution box has two sets of cable clamps, upper for cable DPYCY-1.25/TTYCYS-1
(small hole) and lower for cables TTYCY-2S (medium hole), TTYCY-3S (large hole).
Lay the cables on the clamps as below depending on the terminal board.
TB1: Left side
TB2: Center
TB3: Right side
Cut the cables slack to bind them at the fixing plate with a cable tie, leaving some slack for
future servicing and checking.
All cables except the power cable should be fixed by the clamp with the armor.

Fabrication of DPYCY-1.25/TTYCYS-1

(power cable, contact signal, analog signal, dimmer)
DPYCY-1.25 is a Japan Industrial Standard (JIS) cable. Use the equivalent. DPYCY-1.25 cable
doesn't have shield.
Anticorrosive
Sheath
Armor
S =1.25 mm
=1.35 mm
(Sectional view of DPYCY-1.25)
Fabrication of cable DPYCY-1.25/TTYCYS-1
Entrance Clamp
within 350
Wind the shield.
Armor
Insulation
Shield
Vinyl
2
Sheath
17
FV2-M4