Connecting The Power Cords; Preparing The Product For Integrated Shipping In A Rack; Loosening The Shipping Screws - AudioCodes Mediant 9000 SBC Hardware Installation Manual

Family of session border controllers sbc
Hide thumbs Also See for Mediant 9000 SBC:
Table of Contents

Advertisement

3.7

Connecting the Power Cords

After completing all installation and cable management procedures, you can connect the
power cords to the facility power source. See Section
information. The installation is complete.
3.8
Preparing the Product for Integrated Shipping in a
Rack
Note:
You must provide screws to secure the slide mounting bracket assemblies in a
threaded-hole rack.
Note:
Use the integrated shipping hardware included with this kit to prepare a square-
hole rack for integrated shipping.
3.9

Loosening the Shipping Screws

To slide the server out of the rack, open the latches and loosen the shipping screws.
Hardware Installation Manual
4.2
20
Mediant 9000 SBC
on page
22
for detailed
Document #: LTRT-41659

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mediant 9000

Table of Contents