3.7
Connecting the Power Cords
After completing all installation and cable management procedures, you can connect the
power cords to the facility power source. See Section
information. The installation is complete.
3.8
Preparing the Product for Integrated Shipping in a
Rack
Note:
You must provide screws to secure the slide mounting bracket assemblies in a
threaded-hole rack.
Note:
Use the integrated shipping hardware included with this kit to prepare a square-
hole rack for integrated shipping.
3.9
Loosening the Shipping Screws
To slide the server out of the rack, open the latches and loosen the shipping screws.
Hardware Installation Manual
4.2
20
Mediant 9000 SBC
on page
22
for detailed
Document #: LTRT-41659