Initial Actuator Alignment; Wiring Connections & Setup - 3D Platform WorkSeries 200 Series User Manual

Hide thumbs Also See for WorkSeries 200 Series:
Table of Contents

Advertisement

3D Platform

Initial Actuator Alignment

Prior to powering up the machine, move the Y axis to
the end of the build area, as shown. Gently push both
sides simultaneously so the actuators move smoothly
until they reach the end. This will eliminate any racking
or misalignment.
Note: Initial alignment of the actuators must be completed prior to powering
up. Racking of linear motion actuators can cause serious damage or breakage
to mechanical hardware and/or brackets on the 3D Platform WorkSeries
printer.
3dplatform.com • 3DP-DOC-005 (12-2017)
WorkSeries 200, 300 & 400 Manual
Wiring Connections & Setup
1. Locate the Control Unit
The control unit is stored within the storage drawers for
initial shipment. Unpack the unit and place it on the
front work area of the base unit.
2. Attach Wiring to the Control Unit
Match each 15 pin D-Sub connector with the
corresponding plug on the control box. See diagram
below for reference.
Note: Misconnection of harnesses can result in damage to the Control
Box. Ensure proper mating of the connectors and that the labels
match upon installation.
Revision: B
Date: December 28, 2017
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workseries 300 seriesWorkseries 400 series

Table of Contents