Download Print this page

Dynojet POWER COMMANDER V Installation Instructions page 3

For husqvarna tr650 2013

Advertisement

FIG.A
FIG.B
Ground
FIG.C
23-012
Remove
PCV Harness
Unplug
www.powercommander.com
DO NOT TURN ON THE IGNITION WHILE ANY CONNECTIONS
1
Remove the seat.
2
Remove the right side fairing (Fig. A).
3
Use the supplied Velcro to secure the PCV module to the forward left corner of
the bike's battery.
Clean both surfaces with the supplied alcohol swab prior to attaching the
Velcro.
4
Secure the ground wire of the PCV wiring harness with the small ring lug to
the negative (-) terminal of the bike's battery.
5
Route the PCV wiring harness towards the front of the bike following inside of
the fuel tank's recess for the fuel hose (Fig. B).
6
Locate and unplug the stock wiring harness connector from the bike's Fuel
Injector (Fig. C).
The Fuel Injector is located on top of the throttle body.
ARE UNPLUGGED.
2013 Husqvarna TR650 - PCV - 3

Advertisement

loading
Need help?

Need help?

Do you have a question about the POWER COMMANDER V and is the answer not in the manual?