LG LV240HV4 Installation Manual page 21

Single zone vertical air handling unit
Table of Contents

Advertisement

Drilling the Piping Hole in the Wall
Follow all piping clearance recommendations.
1. Using a 2-5/8" hole core drill bit, drill a hole at the selected location. Avoid
obstructions in the wall such as electrical wires or conduits and water or gas
pipes.
• The slant of the hole must be 3/16" to 5/16" from level with the slant being
upward on the indoor unit side and downward on the outdoor unit side.
2. Finish off the newly drilled hole as shown with bushing and sleeve covering.
• Sleeve and bushing prevents damage to the tubing/bundling of the piping.
See Refrigerant Piping Connections for Indoor Unit for information on piping installation.
• Go to the Refrigerant Piping Connections section of this manual for information on
indoor unit piping connection installation.
• Go to the Electrical Connections section of this manual for information on conduit /
electrical wiring to the indoor unit.
GENERAL INSTALLATION GUIDELINES
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Figure 11: Drilling Piping Hole.
WALL
Indoor
Core Drill
Bushing
Sleeve
Outdoor
21