LG LV240HV4 Installation Manual page 19

Single zone vertical air handling unit
Table of Contents

Advertisement

Outdoor Unit Platform Requirements
Outdoor Unit Foundation Requirements.
Figure 7: LUU188HV and LUU248HV Outdoor Units.
Table 5: Outdoor Unit Foundation Specifications.
Bolt
Outdoor Unit Type
Type
LUU188HV, LUU248HV
M10-J
LUU368HV, LUU428HV,
M10-J
LUU488HV
Bolting the Outdoor Unit to the Platform
1. Ensure that the concrete platform will not degrade easily, and has enough
strength to bear the weight of the unit.
2. Include an H-beam support. Firmly attach the corners, otherwise the support
will bend.
3. Use a hexagon nut.
4. Use anti-vibration material.
5. Include enough space around the concrete foundation for condensate
drainage.
6. Seal all wiring and piping access holes to prevent insects from entering the
unit.
GENERAL INSTALLATION GUIDELINES
Unit: Inch
Concrete Height
Minimum 4 inches
Minimum 3 inches
Minimum 8 inches
Minimum 3 inches
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Figure 8: LMU368HV, LMU428HV, LMU488HV Outdoor Units.
Bolt Depth
Figure 9: Bolting the Outdoor Unit to the Platform (Piping
Location May Differ Depending on Outdoor Unit Model).
Bolt
Bolt
Refrigerant Pipe
Bolt
Connection Location
Top of Outdoor Unit
(Looking Down)
Bolt
Unit: Inch
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lv180hv4Lv420hvLv360hv4Lv480hv

Table of Contents