Cisco UCS C480 M5 Installation And Service Manual page 108

Hide thumbs Also See for UCS C480 M5:
Table of Contents

Advertisement

Moving an M5 Generation CPU
Figure 51: Installing a CPU Socket Dust Cover
-
Step 3
Install the CPUs to the new system:
a) On the new board, align the assembly over the CPU socket, as shown below.
Note the alignment features. The pin 1 angled corner on the heatsink must align with the pin 1 angled corner on the
CPU socket. The CPU-socket posts must align with the guide-holes in the assembly.
Cisco UCS C480 M5 Server Installation and Service Guide
106
Press down on the two circular marks next
to the word INSTALL.
-
Maintaining the Server

Advertisement

Table of Contents
loading

Table of Contents