ABB ACS850 Hardware Manual page 23

Drive modules
Hide thumbs Also See for ACS850:
Table of Contents

Advertisement

Unpack and check the units.
Check that all necessary optional modules and
equipment are present and correct.
Only intact units may be started up.
Check the installation site.
Fasten the base of the cabinet to floor. Install the
drive module into the cabinet.
Route the cables.
Check the insulation of the supply cable, the motor
and the motor cable and the resistor cable (if
present).
Connect the power cables.
Connect the control and the auxiliary control cables.
Check the installation.
Commission the drive.
Commission the brake chopper (if used).
Operating of the drive: start, stop, speed control etc.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
Task
See
Mechanical installation
(page 48)
If the drive module has been non-operational
for more than one year, the converter DC link
capacitors need to be reformed. Ask ABB for
instructions.
Technical data: Ambient conditions
Mechanical installation
(page 47)
Planning the electrical installation: Routing the
cables
(page 67)
Electrical installation: Checking the insulation of
the assembly
(page 77)
Connecting the power cables
Connecting the control unit to the drive module
(page 85),
Connecting the control cables
86),
Resistor braking: Electrical installation
(+D150 units, page
140)
Manuals for any optional equipment
Installation checklist
(page 95)
Start-up
(page 99)
Resistor braking
(page 140)
Appropriate Firmware Manual
Introduction to the manual
23
(page 122)
(page 79),
(page

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs850-04

Table of Contents